Plumbing completed: Kitchen, Utility Rooms & Bathrooms

An essential step forward! When we move into our home, we'll be able to use the bath, showers, w.c. and Quooker! Another significant moment was walking into a warm house when we visited it last weekend. The house is beginning to take shape and almost feels like a home. 

We have the upstairs window blinds ready to go up as soon as the decorating is finished (it's starting next week) and the downstairs blinds should be delivered within the next two weeks.

The sliding doors to hide the utilities are now installed and we are looking to purchase fittings for the built-in wardrobes in the bedrooms. Also, we are now able to put in our order for the tambour doors for the kitchen.

We are currently trying to arrange installation of the log burner, which we purchased such a long time ago. Unfortunately, there is an issue with the granite hearth where one side is 1cm higher than the other side, then it needs some finishing-off between the hearth and the floor. This will either be granite strips, floor wood cuts or a smooth coating of filler, painted black, under the black granite hearth.

Here are some photographs from our recent visit, starting with the sliding wall to hide the utilities:


The glass is in the stairs now: 


Two showers:


Note that the skirting boards have been added now. More images to follow in future posts, in a few weeks. Hopefully, the hard landscaping will be starting soon, as the materials are all stacked in the garden. It is essential to have the disabled access in place (a requirement by the local planning authority) before the house can be signed off - and the driveway must be porous. Signing-off is necessary as soon as possible so that we can have an official address because the post office and telecoms services won't act until it's done. However, our house is now visible using Google maps!

Thanks for reading. Please feel free to leave your relevant comments.


Tuesday 1 September 2009

The Sun Shone in February

Little jobs got done: the utility room was built, which provided a mini-kitchen so that the actual kitchen could be gutted and the downstairs loo was moved in order to accommodate this - accordingly, the upstairs facilities were working.

The oppressive ply wall came down and our living area moved south into the new extension. Larger, lighter and brighter: oh joy! This enabled the ceiling and walls in the original lounge area to be tampered with (pulling down the ceiling before it fell of its own volition, moving the doorway from the lounge into the kitchen, closing off the doorway from the kitchen to the hall).
 
The outside walls were rendered. We "celebrated" 6 months on the job. During March, the downstairs shower room/loo was tiled and fitted (except for the whb which was completed in April, more about that later) and the kitchen was plastered and prepared ready for the units and appliances.

Friday 13 March 2009

Brick Wall Down, Stud Wall Up ...


and ... hey presto! we have a utility/laundry room.
.
If you can be bothered referring all the way back to the plans on one of our original postings, you will see that we had a separate bathroom and toilet. A wall separated the loo from the kitchen.
.
We knocked it down - after moving the W.C. to its new location in the old bathroom, having ripped out the rotted unit that was holding up the whb/sink and was, no doubt, harbouring billions of germs.
.
Meanwhile, Christmas came and went (we went too - spent Christmas elsewhere!), then we built another wall 3ft into the kitchen, thus creating a small (6ft) laundry/utility room. The photo shows the view from the kitchen - you can see the gas boiler on the wall and a temporary mobile pantry-unit! (note the yellow and pink walls - and the electrics! H&S nightmare!)
.
I should clarify that when I say 'we' that means Del and Tone - with a little encouragement from the paymasters.