Tuesday 8 December 2020

Plumbers, Electricians, Carpenters & more...

Flooring - Master Bedroom

Flooring & UltraSlim Doors   * * * * *  Flooring - dining area

A quick check-list of what's been happening in the house over the past month:

  • the flooring is down (see above)
  • the doors are (mostly) in place
  • the wardrobe doors have been fitted
  • the bathroom units have been installed
  • the skirtings have been delivered and are being installed
  • the gas has been connected (finally)
  • there are lights in every room
  • the kitchen worktops are on order
  • the window blinds for the bedrooms and bathrooms have been ordered
  • the bathroom and shower wall panelling is being installed

The carpenters had to cut off a corner at the top of one of the wardrobe doors to enable it to fit in the eaves bedroom, therefore we had to source a solid wood door. The same guys have also been hanging the room doors, fitting the skirtings, installing the fitted units in the bathroom and putting up the shower panelling. They were working long hours and needed to be able to see what they were doing so the electrician was called in. 

bathroom units - Howdens Joinery Now including the kitchen sink!

Wardrobe Doors / Room Door in background
Wardrobe Doors: cut to shape and size by the carpenters

Still to do: install the log burner and fnish off the hearth; order some more window blinds (for the ground floor rooms) and order a set of sliding doors to hide the boiler and hot water tank from the rest of the utility room. The hob, taps and showers need to be installed by the electrican and plumbers, once the worktops and walls are completed. Then we need to thoroughly clean throughout the house and bring in the decorator to give all the walls and ceilings a one (or twice) over. 

We won't be in for Christmas, unfortunately, as the covid situation has cost us about 12 weeks' delay. 

** Wishing you a Happy Christmas ** 
~* ~* ~* ~* ~* ~* ~* ~* ~* ~* ~* ~* ~* ~* ~* ~* ~*

We'll keep you posted!
P.S. This is a useful blog for crafty DIYers: catalogue of home ideas 

Wednesday 22 July 2020

Plasterboarding & Gas Works

We have finalised our choice of floors and received the quotaion. We have also confirmed the doors and their openings, including the mid-stairs and under-stairs cupboards and we've chosen the handles and locks. The stairs will be delivered 'unfinished' to be stained and lacquered when in place. 

Internally, the ceilings and walls are now fully covered with appropriate plasterboard.

Plasterboarded walls with electrics ready

Plasterboarded walls with plumbing ready

Much of the work now has to be put on hold for a couple of weeks while the Gas supply is brought from the mains to the property. 


On the one hand, this is annoying because it will delay us moving in but, on the other hand, we'll have more time to choose units for the kitchen and bathrooms. We are having trouble buying off-the-shelf units for the small en-suite and are considering some bespoke work. However, we've spent more than we anticipated on a few things so we need to budget carefully. We knew this would happen, of course, we've been there before - twice.

We usually justify the overspend in our minds by relating the additional cost over the next ten years to the enjoyment of living with the results! If you love where you live, going away for holidays is not quite so important, so that cost can be off-set, too.

I don't suppose there will be much progress to report over the next couple of weeks so look out for the next update around the middle of August.