Sunday 17 May 2020

Mid-May New-Build Update

With most of the scaffolding gone, we now have bricks ready and waiting... 

Bricks, ready to go

Can't wait to see the result - below is the illustration of roughly how we expect the house to look.

Front elevation, newbuild

Internally, some interesting stuff has been going on. We don't like radiators - they take up too much wall space - so we opted for underfloor heating and something referred to as mvhr. It's a mnemonic for Mechanical Ventilation with Heat Recovery, a system which continuously ventilates the property by extracting used, moist air and replaces it with fresh, filtered air. Whilst doing so, it maintains a constant temperature. It also means that we don't need to separately vent the bathrooms or have a cooker hood (horrible, noisy things!).

We've never experienced mvhr but we expect that we may have to top up the heat on cold days with the underfloor heating. On hot days, there are windows to create a cool breeze. We shall see.

MVHR system

The photograph above shows the complex bits and bobs related to mvhr.

Just wait till you see the outside of the house in the next instalment!