Delays and a Few Snags :(

In-house Progress

The kitchen and utility units are being fitted by Bill and Daren. This is going very well so far - hooray! The same guys will also be creating a unit to conceal the wc cistern and a built-in wardrobe in a very tricky place - where two roofs come together in an eaves bedroom. 

Today, the kitchen appliances have been delivered: ovens, hob and 'fridge. The sinks and taps are on order - fingers crossed that there is no further delay because:

  1. the taps need to be fitted first;
  2. then the sinks;
  3. then the template for the worktop can be finalised;
  4. then the hob can be inserted.
Other good news is that the internal doors and frame kits have been delivered (even though we don't seem to have the handles and locks - only the hinges). The doors are a very nice colour, a sort of grey-oak veneer.

Snags

The Stairs! When the fitters came to install the stairs, they discovered that the main electric consumer unit had been placed on the wall where the under-side of the stairs needed to run. A few days were lost while the unit was moved and then the fitters returned.

Having installed the top half of the stairs and the mid-way platform, they put the lower half of the staircase where it needed to be - only to discover that it protruded too far into a corridor. Measurements had not been taken accurately. The staircase has to be completely re-constucted! Luckily, the company are treating this as a high priority and expect the new one to be ready in 2-3 weeks.

A couple of items seem to be wrong or missing from the kitchen delivery, mainly doors, but they are local so we do not anticipate major delays.

The flooring company are scheduled to lay the boards as soon as the stairs, kitchen/utility units and shower trays (see 'Delays') are in place. 

Delays

Well, it may be a coincidence but the "second wave" of Covid seems to have had a negative effect on supplies. Some ordered items have had their delivery date pushed back and some items that have yet to be ordered are projecting a long lead-time.

For example, several suppliers of wooden plantation shutters are quoting 12 weeks instead of 2-4 as most sustainable wood is imported and in short supply - could this be because climate change (and stupidity, in some cases) caused several forest fires, creating demand for timber? I don't know, just wondering... so, for the time being, we will order some roller blinds for most of the windows.

Other timber-based items are also in short supply, as are other building materials. We've also found that some retail items (probably imports) are becoming scarce, such as taps and shower trays.

Pictures!

The utility room almost looks like this illustration:


The kitchen: the first image below is from the wall where the sink will be, looking towards the dining room. The second image is an illustration of the kitchen units to the left of the patio doors and the drinks station to the right, in the dining area.


More to report soon! Feel free to view our 2020 progress.